Justin L. Weisberg is a Shareholder in the Firm’s Chicago office and a member of the Litigation Practice Group. Mr. Weisberg has over 30 years of legal experience in the practice areas of construction law and commercial litigation. He represents private, public, local, and international clients in a variety of construction-related transactions and litigation matters.
His legal experience has included contract negotiation and drafting of design, design build, IPD, P3 and construction contracts as well as mediation, arbitration and litigation including both bench and jury trials of numerous disputes involving design, construction and insurance coverage matters. Justin’s prior work as a registered professional engineer in both Illinois and Florida allows him to give added insight and understanding for ongoing project counseling to his clients.
Mr. Weisberg’s substantial experience has involved handling numerous construction projects including office, commercial, and residential buildings; nuclear and coal fired power plants; manufacturing facilities, laboratories, water distribution systems, waste water treatment facilities, schools, libraries, stadiums, exposition centers, governmental facilities, roads, bridges, transit stations, refineries, solar energy facilities, LNG facilities, ethanol plants and single family residences.
Justin has been an ASCE delegate on EJCDC for over 15 years, and he is a past Chair of EJCDC, and was the Chair of the Task Force that developed the EJCDC P3 Contract Form. He also is a member of the National Construction Dispute Resolution Executive Committee, Construction Section Counsel and former Chair of the Construction Section of the Illinois State Bar Association (ISBA), a member and Division II Chair of the American Bar Association (ABA) Construction Forum, and a member and former Chair of the Illinois Society of Construction Attorneys. Justin is a member and former Chair of the American Society of Civil Engineers, Illinois Chapter of the Construction Institute.
Awards and Honors
- Illinois Super Lawyers Honoree in Construction Litigation, 2006-Present
- Illinois Leading Lawyers Honoree in Construction Law, 2024
- Recipient of the 2024 Martindale-Hubbell Award-AV Preeminent Rating
Professional Involvement
- American Society of Civil Engineers (ASCE), Illinois Chapter of the Construction Institute, Chair, 2020-2021
- Member, ABA Construction Forum, Division II, Chair
- Member, ISBA Construction Section, Counsel & Former Chair
- Member, Society of Illinois Society of Construction Attorneys-Past President
- Member, Steering Committee of Division II of the ABA Construction Forum 2018-2023
- EJCDC Chair 2012-2013, Delegate 2004 -2024, Chair of P3 Subcommittee
- ASCE Construction Institute, Former President-Illinois CI Chapter
- LCI Chicago COP Board, 2014-2016
- AGC BIM Module 3 Instructor
- COAA Illinois Section Programming, Co-Chair-2016-2018
- Registered Professional Engineer, Illinois and Florida
-
-
15
Jan
-
New Year, New Office Buchalter Opens Office in Chicago, Illinois
Firm News
-
January 15, 2025. Buchalter is pleased to announce the opening of its newest office in Chicago, Illinois with addition of lawyers and staff of the […]
-
-
-
Presentation
Justin Weisberg, Attending the ABA Construction Forum, Division II Networking Event
January 16th, 2025
-
-
-
Presentation
Justin Weisberg Co-Speaker at the CI & CRC Joint Conference
March 20th, 2024
-
-
-
Presentation
Justin Weisberg Co-Presenter at the Illinois State Bar Association
January 17th, 2024
-
-
-
Presentation
Justin Weisberg Co-Speaker at the ABA Forum on Construction Law
April 12th, 2023
-
-
-
Presentation
Justin Weisberg Presenter at the American College of Real Estate Lawyers
January 25th, 2023
-
-
-
Presentation
Justin Weisberg, Co-Speaker at the ABA Construction Forum Annual Meeting
January 1st, 2023
-
-
-
Presentation
Justin Weisberg Speaker at the ASCE Construction Institute (Illinois Chapter)
September 20th, 2022
-
-
-
Presentation
Justin Weisberg Co-Presenter for the Construction Industry Owner-to-CEO Business Accelerator Program
April 20th, 2021
-
-
-
Presentation
Justin Weisberg Speaker at the ISBA Construction Law Section Seminar
March 13th, 2020
-
-
-
Presentation
Justin Weisberg Speaker at the Florida Bar
March 5th, 2020
-
-
-
Presentation
Justin Weisberg Panelist at the Construction Institute Summit
February 20th, 2020
-
-
-
Presentation
Justin Weisberg Speaker at the Society of Illinois Construction P3 Subcommittee
December 11th, 2019
-
-
-
Presentation
Justin Weisberg Speaker for HalfMoon Education Seminars
October 23rd, 2019
-
-
-
Publication
Dispelling the Myths of Lien Construction and IPD
December 13th, 2016
-
-
-
Publication
Licensing Requirements and Public Construction
January 13th, 2016
-
-
-
Publication
Working with Experts/Consultants
January 13th, 2013
-
-
-
Publication
Negotiating Construction Contracts
January 13th, 2010
-
-
-
Publication
Claims Handling and Dispute Resolution and Consolidation and Joinder
January 13th, 2008
-
-
-
Publication
The Use of Experts in Construction Litigation – Parts 1 and 2
January 13th, 2006
-
-
-
Publication
Keeping Your Complex Construction Case Under Control
January 13th, 2005
-
-
-
Publication
Between A Rock and A Hard Place: Balancing the Interests of The Principal and Oblige
January 13th, 2004
-
-
-
Publication
Securing United States Assets on Multinational Projects
January 13th, 2000
-
-
-
Publication
Professional Standards For The Geotechnical Engineer, A legal Perspective Geo- Engineering for Underground Facilities
January 13th, 1999
-
-
-
Publication
Managing Risk: An Environmental Engineering Perspective
January 13th, 1998
-
-
-
Publication
Knowing the Risks When Embarking on an International Venture
January 13th, 1997
-
- Arbitration award in excess of $1 Million Dollar client for payment of materials provided to site and successful defense against delay counterclaim in excess of $2 Million.
- Representation of Owner in Construction and CM Agreements for Office Buildout construction in multiple states.
- Obtained summary judgment dismissing curtainwall contractor in defense of $3 million dollar claim.
- Representation of owner client relative to Engineering, CM and Contractor Agreements for rail terminal facility.
- Representation in Public Owner in multimillion dollar litigation involving delays.
- Representation of client in negotiations with municipality and downstream engineers and contractors relative to DBOM agreement.
- Representation of mechanical contractor in matter against insurance carrier seeking indemnity reimbursement of remediation costs and damages from ruptured piping and resulting water damage in litigation and a two-week jury trial resulting in a verdict of approximately $2.5 million dollars on behalf of mechanical contractor.
- Representation of metal work contractor relative to delay claim by contractor.
- Representation of contractor in extended arbitration hearing over a two-week period involving claims concerning installation of over 17 miles of piping.
- Representation of developer in extended arbitration hearing over a two-week period in defense of claims by consultant.
- Representation of owner in litigation and a five-week jury trial in dispute with terminated contractor relative to contract disputes and associated claims.
- Representation of roofing contractor in defense of $2 million dollar defect claim by owner.
- Representation of contractor relative to multi-million dollar claim by owner claiming defects in construction of waste-water treatment facilities.
- Legal review and advice on contract documents including the draft general contract, general conditions, and technical specifications for , 95-story condominium and retail project in Chicago.
- Representation of Condominium Association in obtaining settlements totaling approximately $3 million dollars from General contractor and subcontractors relative to Facade defects.
- Negotiate and prepare construction contract for 2.5-mile roadway.
- Successful representation of Condominium Association against subcontractors at trial and appeal on issue regarding Associations right to pursue subcontractors directly where contractor was insolvent but had insurance.
- Represented P3 concessioner in negotiating and drafting agreement for concession to provide fiber optic services to an Illinois county for 25 years.
- Representation of insurance general liability carrier in defense of multi-billion dollar claim by Oil Company against the insurance companies that issued policies to the oil company over several decades relative to environmental claims brought against the oil company, including taking lead in depositions of technical witnesses, preparation and coordination of experts, and participation at pre-trial conference that resulted in settlement.
- Representation of insurance general liability carrier in defense of claim by insured manufacturer of plastic fittings used in plumbing systems that resulted in hundreds of millions of dollars in claims.
- Representation of insurance professional liability carrier in coverage dispute involving the design of a nuclear power plant and a separate project involving the design of a precipitator for a coal fired plant.
- Negotiated and drafted numerous design, construction, and design build contracts for many different types of public and private projects across the United States.
- Representation of contractor in dispute with a municipality in litigation through mediation relative to claims relating to final completion, payment, delays, and liquidated damages for construction of waste water treatment plant.
- Representation of contractor relative to dispute with water district for construction of pumping station concerning final payment and warrant claims relating to operation of gate valves on 24-inch-high pressure pipe.
- Representation of design builder in litigation relative to bond claim against defaulting demolition subcontractor‘s surety.
- Representation of design builder in litigation relative to differing site condition claims by subcontractors.
- Representation of contractor against large municipality in mediation and arbitration involving dispute over delay, completion and payment.
- Representation of contractor against state relative to contractor’s delay claim, liquidated damages claimed by state, close out, and final payment.
- Representation of contractors, trade contractors, manufacturers, and suppliers, relative to numerous public and private lien claims, bond claims, and prompt payment claims.
- Representation of mechanical trade contractor in asserting Miller claim relative to construction of housing facility at offshore military base.
- Representation of trade contralto r relative to mechanics lien claim following the failed construction of an ethanol plant in Nebraska in litigation through mediation.
- Representation of terminated electrical subcontractor in dispute with contractor in pursuing lien, bond, and prompt payment claims while defending against counter-claim alleging defective construction and breach of contract relative to construction of HVAC system for school resulting in judgment on behalf of subcontractor in excess of $1.2 million.
- Representation of national glazing contractor debtor relative to the assertion of numerous contract and lien claims, and the negotiation of various construction disputes, during the administration of a Chapter 11 bankruptcy proceedings.
- Representation of design build contractor against surety relative to performance bond claim against defaulting demolition subcontractor on terminal facility construction project.
- Representation of mechanical subcontractor against surety asserting performance bond claim against surety, based upon defaulting lab gas piping subcontractor during construction of university research laboratory resulting in settlement of approximately $3.7 million dollars on behalf of subcontractor.
- Representation of terminated electrical contractor in defense of performance bond claim asserting over $3 million dollars in delay damages relative to construction of two schools and with respect to assertion of electrical contractors counter-claim asserting contract, public lien and payment bond claims resulting in the recovery of $1.2 million dollars for electrical subcontractor under public lien claim and dismissal of contractors contract and bond claim.
- Representation of electrical subcontractor in pursuit of delay claim, lien and bond claim and in defense of counterclaim by contractor asserting in delay damages resulting in recovery of $250,000 on behalf of electrical subcontractor.
- Retained as expert by large law firm to provide report and testify in deposition relative to malpractice claim concerning underlying construction dispute.
- Representation of marine contractor to evaluate claims and defenses to be asserted against municipality in response to claims arising out of collapse of water intake tunnel.
- Representation of insurer relative to evaluation of coverage and indemnity rights and obligations in response to a complaint alleging contract and warranty claims by California public agency against insured manufacturer of transit cars.
- Represented health care company to evaluate required bond terms to comply with Health Care Statute relevant to construction of new hospital tower.
- Represented large manufacturer in the drafting of design build agreements for the renovation of plants for three separate projects.
- Representation of mechanical contractor relative to dispute with general contractor relative to completion, delays, change orders, and payment relative to construction of hospital.
- Representation of millwork subcontractor relative to dispute with general contractor over completion and payment.
- Representation of design builder relative to claims for damages resulting from design errors and omissions by grandstand subcontractor relative to construction of
- Representation of large institutional owner relative to drafting of construction and design contracts for use by client on multiple projects.
- Representation of electrical contractor against competing electrical contractor seeking injunctive relief and damages for Lanham Act violations and fraud.
- Representation of electrical contractor related to claims for injunctive relief and damages concerning joint venture membership valuations, tortious interference, and fraud.
- Representation of design builder in litigation related to defense of wrongful death claim, related coverage claims under additional insurance policies, and related OSHA charges.
- Representation of architect in defense of bodily injury claim based upon alleged design errors and resulting in judgment dismissing architect with prejudice.
- Several matters relating to the representation of contractors and subcontractors on bid protest claims.
- Several matters relating to the representation of subcontractors in response to OSHA or associates state entity charges.
Pro Bono
- Development of language and testimony of a bill adding new provisions in Condominium Act relative to authority of board to act on behalf of association and testimony in support of bill in front of Illinois House Judiciary Committee.
- Testimony in support of Illinois House judiciary Committee proceeding on a law that would allow bonds to be posted to release mechanics liens and negotiation and revision of bill in form for final passage.
- Participation on committee to draft bill revising Illinois Bond Act.
- Testimony in front of House judiciary Committee in support of bill to clarify the mechanics lien priority of subcontractors.
- ASCE Delegate to EJCDC since 2005 participating in the drafting of a number of form contract documents and Task Force Committee Chair on subcommittee that developed the first P3 contract form in the United States.
- Served as board member of 247-unit condominium buildings including several separate terms as treasurer and subsequently president.
Engineering Experience
- Underwater facility inspection and development of condition report of Trident Submarine Base, Bangor, Washington.
- Design of various highway bridges and associated retaining walls.
- Replacement of gate valves in underground municipal water tank.
- Inspection and evaluation of movable Strauss Trunnion Bridge.
- Condition reports of various fixed and movable bridges in Chicago, Illinois.
- Inspection, calculation, and assessment of various transit and railroad structures.
- Design of various transit stations and elevated rail structure for the Chicago Transit Authority.
- Inspection and reconstruction design of 70-year-old, three span, four track Railroad Bridge.
Mr. Weisberg earned his J.D. from Chicago Kent College of Law. He earned his B.S.E. in Engineering from University of Illinois.
- United States District Court, Northern District of Illinois
- Supreme Court of the United States
- 1111 South Wabash Condominium Association – Treasurer 2012-2014, President 2014-2017
Additional Specialties
Contract Negotiation
Drafting of Design
Design Build
IPD
P3 and Construction Contracts
Arbitration & Mediation